Today's goal was to install the front bulkhead cabinet. Started by installing the frame on the bottom and sliding it into place. Next we slid the front frame and trim piece in place and did a bit of trimming to make it fit. Slide in the front and held every thing in place to make sure that everything fit. Had to tweak a few things, but it fits like a glove now. Kurt brought his air nailer today. Man that works really slick! Took less than 10 minutes to nail everything in place.

No comments:
Post a Comment